We offered a perfect solution to a problem of a 9th floor area that was 2 1/4" out of level on approximately 4000 s/f. The Contractor needed the floor to be leveled but the structural engineer had a weight tolerance of 12# per S/F. Midsouth was able to offer a solution by using LDF for all the deep fill areas and then topped and level the floor with Level Crete.