Moisture Vapor Barrier

MVP One


One component. Two coats. Moisture blocked.

  • Ready-to-use, zero-VOC moisture barrier and primer
  • Use over concrete slabs up to 100% RH and a pH of 14
  • Concrete must be porous – profiling may not be required
  • Quick drying - install underlayment or patch in 30-60 minutes
  • Less than 0.10 perm rating as required by ASTM F3010 (meets or exceeds ASTM E96)

Contact Your Rep

Application
Residential and commercial construction.

Subfloor
Interior concrete subfloors below, on or above grade.

Technical Data

VOC0 g/L, water-based and non-toxic
Packaging5-gal (19 L) pail
Storage Temperature65 - 90 °F (18 - 32 °C), keep from freezing
Coverage200 - 250 ft²/gal (6.13 m²/L)
Application Rate500 ft² (46.5 m²)
ColorMilky white, dries clear
Dry Time30-60 min per coat
Installation Temperature45 - 100 °F ( 7 - 38 °C)
Shelf LifeUnopened product shelf life is 12 months
RH LimitsUp to 100%
MVER LimitsUp to 25 lbs (11.3 kg)/1000 ft² (92.9 m²)
Recoat Time30 to 60 min
pH14


maxxon logo

The Subfloor Experts

Find the right solution for your floors
Contact Us