Dwight D. Eisenhower Elementary School
Parlin, NJ
Scope
Performed by Maxxon Authorized Installers, this project started with a deep pour of Gyp-Crete High Performance installed to depths between 1” to 1 ½” in all common areas of the school facility. After a few weeks of drying time, installers poured a 1/2” average cap of Level EZ, a smooth flowing, self-leveler to prepare the surface for new flooring